Submittals: the approval that has to happen before the order

Product data, samples, manuals: nothing goes into the building before the design team signs off on the paperwork. The submittal log is the quiet gatekeeper of the schedule.

Submittals are the quality-control gate of a project: before work can proceed, the contractor submits product data sheets, samples, mockups and manuals for approval by the architect or engineer, proving that what will be installed matches the drawings and specifications. As Procore's guide to submittals explains, the process starts before the work and runs all the way to closeout. Nobody sees submittals in the finished building, but everybody feels them in the schedule.

Why they stall projects

The math is unforgiving: a submittal that takes three weeks to be reviewed sits directly on top of the long-lead item it authorizes to buy. The elevator cannot be ordered before its submittal is approved; the approval waits in someone's inbox; the delivery date moves; the opening date moves with it. Most late projects have a submittal chapter in their story.

The log that keeps the gate moving

  • Every required submittal listed at kickoff: straight from the spec book, with its package contents defined.
  • A need-by date per item: derived from the procurement schedule, not from when someone remembers to send it.
  • One status per row: in preparation, sent, under review, approved, approved as noted, rejected and resubmit.
  • Resubmittals tracked like first submissions: a rejected package is not the end, it is a new clock.
  • Closeout documents in the same log: manuals and warranties are submittals too, and the last payment waits for them.

What the gate buys

Approved submittals mean ordered materials, protected dates and a design team that answers because the question arrived complete and on time. The gatekeeper works when someone owns the log weekly. And because submittals live between the estimate, the schedule and the purchase order, they belong in the same system that holds the rest of the project: that is the connected operation an ERP for construction companies implements around the way each contractor works.

Who owns your submittal log this week?

Approvals, procurement and schedule in one connected system, implemented around your company's processes.